Office acoustic treatment in open-plan workspaces combines the ABC method (Absorb-Block-Cover) — echo control, workstation privacy and pink-noise masking. Acoustic ceiling + desk-level dividers + sound masking + phone booth deliver target RT60 0.5-0.7 s and a privacy index of 0.80+. Worker productivity rises 30-40%.
What is office acoustic treatment?
Office acoustic treatment is the design discipline that systematically resolves noise sources and reverberation issues in open-plan workspaces. Unlike classic residential acoustics, the parameters include many users, video-conference density and dynamic space usage.
The ABC method
A — Absorb
To reduce reverberation, sound-absorbing materials are added to surfaces:
- Acoustic ceiling panel (NRC ≥ 0.80)
- Suspended baffle / cloud panel
- Wall absorber fabric-wrapped panel
- Carpet tile, acoustic divider
B — Block
To break the direct sound path between workstations:
- Acoustic dividers of sufficient height (1.3-1.7 m)
- Phone / focus booth
- Meeting-room partition wall
- Manager glass partition (acoustic glass)
C — Cover
Sound masking systems play pink noise; speech intelligibility at neighbouring stations drops, creating the feeling of privacy.
Target parameters
- RT60: 0.5-0.7 s
- NC: 35-40
- STI at neighbouring station: under 0.50 (privacy)
- Privacy Index: 0.80+
Panel calculation per workstation
Our practice targets at least 2-3 m² of sound-absorbing surface per worker. The acoustic ceiling supplies most of this; if it falls short, wall and cloud panels are added.
Hybrid working — phone booth essential
Post-pandemic offices have an increased video-call density. Our designs target 1 phone booth per 4-6 workers. A phone booth delivers Rw 30-35 dB; significantly improving the feeling of privacy.
Productivity impact
Harvard Business Review research: office noise can drop cognitive performance by up to 66%. World Green Building Council: turnover is 12% lower in acoustically comfortable offices. The acoustic investment is a small share of office furniture budget; it amortises in the first year through productivity.
Lead time and phasing
Renovation in an existing office 1-2 weeks (night/weekend work option). New office design 3-4 weeks. Cycle: measurement + worker survey + design + application.
Features
On-site acoustic measurement and noise source analysis
Detailed engineering with professional simulation software
Certified material selection (BS476 Class 0, UNI 9175)
Meticulous installation and execution with our experienced team
Final measurement and performance warranty report
Process
Survey & Measurement
On-site survey and acoustic measurement.
Simulation & Design
Simulation with acoustic software, detailed quote.
Installation
Turnkey installation with certified materials.
Verification & Report
Final measurement, performance report, warranty.
Technical Specifications
| Application Standard | BS476 Class 0, UNI 9175 M1, Firex |
|---|---|
| Typical Noise Reduction | 25-45 dB (project-dependent) |
| Installation Time | Confirmed after survey (1-15 days) |
| Warranty | Measured result + 2-year workmanship warranty |